Effects of Predictors on Power Consumption Estimation for IT Rack in a Data Center: An Experimental Analysis

dc.contributor.authorTakci, Mehmet Turker
dc.contributor.authorGözel, Tuba
dc.date.accessioned2025-10-29T11:08:42Z
dc.date.issued2022
dc.departmentFakülteler, Mühendislik Fakültesi, Elektronik Mühendisliği Bölümü
dc.description.abstractThe appropriate feature/predictor selection is as significant as building efficient estimation methods for the accurate estimation of power consumption, which is required for self-awareness and autonomous decision systems. Traditional methodologies define predictors by assessing whether there is a relationship between the predictors and the response variable. Contrarily, this study determines predictors based on their individual and group impacts on the estimation accuracy directly. To analyze the impact of predictors on the power-consumption estimation of an IT rack in a data center, estimations were carried out employing each prospective predictor separately using the measured data under the real-world workload. Then, the ratio of CPU usage was set as the default predictor, and the remaining variables were assigned as the second predictor one by one. By utilizing the same approach, the best combination of predictors was determined. As a result, it was discovered that some variables with a low correlation coefficient with power consumption improved the estimation accuracy, whereas some variables with high correlation coefficients worsened the estimation result. The CPU is the most power-consuming component in the server and one of the most used predictors in the literature. However, the estimation accuracy obtained using only the CPU is 10 times worse than the estimation result conducted by utilizing the predictor set determined at the end of the experiments. This study shows that instead of choosing predictors only from one point of view or one method, it is more convenient to select predictors by assessing their influence on estimation results. Examining the trend and characteristics of the estimated variable should also be considered.
dc.description.sponsorshipEuropean Union [734273]
dc.description.sponsorshipMarie Curie Actions (MSCA) [734273] Funding Source: Marie Curie Actions (MSCA)
dc.description.sponsorshipThis work was supported in part by the GREENDC project from the European Union's Horizon 2020 research and innovation program under the Marie Sklodowska-Curie grant agreement No. 734273.
dc.identifier.doi10.3390/su142114663
dc.identifier.issn2071-1050
dc.identifier.issue21
dc.identifier.orcid0000-0002-5417-6621
dc.identifier.orcid0000-0003-4798-0635
dc.identifier.scopus2-s2.0-85148301586
dc.identifier.scopusqualityQ1
dc.identifier.urihttps://doi.org/10.3390/su142114663
dc.identifier.urihttps://hdl.handle.net/20.500.14854/5470
dc.identifier.volume14
dc.identifier.wosWOS:000884018300001
dc.identifier.wosqualityQ2
dc.indekslendigikaynakWeb of Science
dc.indekslendigikaynakScopus
dc.language.isoen
dc.publisherMdpi
dc.relation.ispartofSustainability
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı
dc.rightsinfo:eu-repo/semantics/openAccess
dc.snmzKA_WOS_20251020
dc.subjectdata centers
dc.subjectpower consumption estimation
dc.subjectfeature selection
dc.subjectpredictor selection
dc.subjectcorrelation analysis
dc.subjectload forecasting
dc.subjectnonlinear regression
dc.titleEffects of Predictors on Power Consumption Estimation for IT Rack in a Data Center: An Experimental Analysis
dc.typeArticle

Dosyalar