A validation model to reduce non-contributory time based on Lean tools: Case of a construction company in Peru

dc.contributor.authorCabrera, Olenka
dc.contributor.authorTejeda, Joselyn
dc.contributor.authorLlontop, Jose
dc.contributor.authorMendoza, Pablo
dc.contributor.authorAlvarez, Jose C.
dc.contributor.authorDemirkesen, Sevilay
dc.date.accessioned2025-10-29T11:16:38Z
dc.date.issued2023
dc.departmentFakülteler, Mühendislik Fakültesi, İnşaat Bölümü
dc.description.abstractThe construction industry has long been suffering from high rates of non-contributory time. Construction processes are likely to include time, which is sometimes lost for non-value-adding operations resulting in time waste. Considering the large percentage of lost time in all operations, this study aims to reduce the high rate of non-contributory time (NCT) in construction services. To test the management model, a Peruvian company was selected as a study case. In this respect, a management model based on mostly implemented Lean tools such as Kanban, 5S, and TPM was utilized. It is of utmost importance to emphasize that this proposal aims to reduce the NCT by up to 25%, as well as reduce the number of orders generated with delay, and eventually reduce the loss or damage of materials and equipment stoppages.
dc.description.sponsorshipGebze Technical University [UPC-EXPOST-2023-1]
dc.description.sponsorshipAcknowledgments The authors would like to acknowledge to Direccion de Investigacion de la Universidad Peruana de Ciencias Aplicadas, which provided financial and research facilities support through UPC-EXPOST-2023-1 and the Gebze Technical University.
dc.identifier.doi10.1080/23311916.2023.2236838
dc.identifier.issn2331-1916
dc.identifier.issue1
dc.identifier.orcid0000-0002-8627-6328
dc.identifier.orcid0000-0002-2459-9236
dc.identifier.scopus2-s2.0-85166519712
dc.identifier.scopusqualityQ2
dc.identifier.urihttps://doi.org/10.1080/23311916.2023.2236838
dc.identifier.urihttps://hdl.handle.net/20.500.14854/7685
dc.identifier.volume10
dc.identifier.wosWOS:001037134400001
dc.identifier.wosqualityQ2
dc.indekslendigikaynakWeb of Science
dc.indekslendigikaynakScopus
dc.language.isoen
dc.publisherTaylor & Francis As
dc.relation.ispartofCogent Engineering
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı
dc.rightsinfo:eu-repo/semantics/openAccess
dc.snmzKA_WOS_20251020
dc.subjectconstruction industry
dc.subjectKanban
dc.subjectlean tools
dc.subjectnon-contributory time
dc.subject5S
dc.subjectTPM
dc.titleA validation model to reduce non-contributory time based on Lean tools: Case of a construction company in Peru
dc.typeArticle

Dosyalar